Preservation Of Studs and Bolts – Case #2

PROBLEM:  The plant was undergoing a two-year shutdown. Many dismantled stud bolts and nuts at the site needed to be cleaned and continuously protected against salt air, humidity, and moisture in an aggressive atmosphere. SOLUTION:  Stud bolts and nuts were dipped in VpCI®-422 rust remover (see Below for Product Info) and subsequently cleaned/neutralized with VpCI®-414.…

Read More

Airport Runway Lights Failing – ICS/Cortec Solutions

Airport Challenge: Runway Lights Failed on Regular Basis Our client sought help from us hoping to create a longer life span with the Runway Lights at their Airport. Having to change the lights often caused not only a financial strain but increased hourly attention for the maintenance team. Repeated Authority Inspections cited Runway light failure as…

Read More